As and when required, survey reports can be developed into building contracts either as Schedules of Works or as Performance Specifications and, if required after the contracts have been let, Pivotal Services also assist in the contract management as relating to building services.

Main Focus of Review

Surveys Undertaken

  • Heating installations using gas, oil or electric as fuel, with electric being as part of an air or ground source heat pump system.
  • Air conditioning installations using chilled water fan coils or refrigerant based split packaged or VRF systems.
  • Ventilations systems, both mechanically assisted of natural.
  • Domestic hot and cold water systems and plumbing.
  • Water and gas based fire fighting and fire suppression systems.
  • High and low voltage electrical distribution, generally within buildings.
  • Lighting and emergency lighting and automatic lighting control systems.
  • Data and telecom distribution systems
  • Fire alarms and fire detection installations.
  • Lightning protection.
  • Lifts and other vertical transportation systems.
  • Due diligence pre-acquisition reports on buildings being bought as freehold (or head leasehold) for investment purposes.
  • Due diligence pre-acquisition reports on buildings being bought as freehold (or head leasehold) for investment and occupational purposes.
  • Due diligence pre-acquisition reports on buildings where a lease is being purchased, for part or all the building, for occupational purposes.
  • Lease termination (or interim) schedules of dilapidations.
  • Lease commencement schedules of conditions (normally photographic with limited text).
  • Feasibility studies for proposed alterations and/or refurbishments and redevelopment projects.
  • Energy efficiency studies.